
Vertical turbine pump overhaul
A full-length vertical turbine pump pulled and laid out on stands — column sections, bowls, and discharge head inspected end to end before the rebuild begins.
- Scope
- Teardown, inspection, bowl & shaft rebuild
- Result
- Returned to the pit ready to pump





















